21-0318
| 3.1 | Item(s) for Discussion | APPROVAL OF COMMITTEE MINUTES | |
Not available
|
22-0048
| 3.2 | Item(s) for Discussion | CONSIDERATION OF DRAFT STAFF REPORT - AWARD A PROGRESSIVE DESIGN-BUILD CONTRACT FOR THE SOUTH STOCKTON GROUNDWATER WELL REHABILITATION AT WELL SSS8 | |
Not available
|
22-0051
| 3.3 | Item(s) for Discussion | REGIONAL WASTEWATER CONTROL FACILITY MODIFICATIONS PROJECT UPDATE | |
Not available
|
22-0049
| 3.4 | Item(s) for Discussion | REGIONAL WASTEWATER CONTROL FACILITY FINAL EFFLUENT CONVEYANCE REDESIGN (AKA EAST BANK OUTFALL) | |
Not available
|