Title: PRELIMINARILY APPROVE THE 2021-22 STOCKTON CONSOLIDATED STORM DRAINAGE MAINTENANCE ASSESSMENT DISTRICT 2005-1 ANNUAL ENGINEERS' REPORT, THE PROPOSED FISCAL YEAR 2021-22 BUDGET, AND SET A PUBLIC HEARING FOR JUNE 8, 2021
Attachments: 1. Attachment A - District Zones Location Map, 2. Attachment B - Summary of Zone Budgets, 3. Proposed Resolution

title

PRELIMINARILY APPROVE THE 2021-22 STOCKTON CONSOLIDATED STORM DRAINAGE MAINTENANCE ASSESSMENT DISTRICT 2005-1 ANNUAL ENGINEERS’ REPORT, THE PROPOSED FISCAL YEAR 2021-22 BUDGET, AND SET A PUBLIC HEARING FOR JUNE 8, 2021

 

recommended action

RECOMMENDATION

 

It is recommended that the City Council adopt a resolution to:

 

1.                     Preliminarily approve the Fiscal Year (FY) 2021-22 Annual Engineers’ Report for the Stockton Consolidated Storm Drainage Maintenance Assessment District 2005-1

 

2.                     Preliminarily approve the FY 2021-22 proposed budgets for each zone.

 

3.                     Approve setting a Public Hearing for June 8, 2021.

 

4.                     Authorize the City Clerk to publish notice of the public hearing.

 

It is further recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.

 

body

Summary

 

If approved, this action will preliminarily approve the Annual Engineers’ Report and preliminarily approve the FY 2021-22 budget for each zone of the Consolidated Storm Drainage Maintenance District 2005-1 and set a Public Hearing date for June 8, 2021. The proposed assessments are to remain at the same level as the prior years’ zone assessment amounts. All budgets in each zone are below the maximum allowable amount. Annual approval of the budget and Engineers’ Report is required by the Municipal Improvement Act of 1913 and the Stockton Improvement Code, Part V. A copy of the FY 2021-22 Annual Engineers’ Report is on file in the City Clerk’s Office  and can also be found on the City of Stockton website at the following link:  <http://www.stocktonca.gov/government/departments/municipalUtilities/utilStormInd.html>

 

DISCUSSION

 

Background

 

On July 26, 2005, the City Council adopted Resolution 05-0329 to establish an assessment district designated as the “Stockton Consolidated Storm Drainage Maintenance Assessment District No. 2005-1” (District) and the creation and annexation of zone 1, known as “Riverbend Zone 1.” The formation of this District was based on the provisions of the Municipal Improvement Act of 1913 (Act) and the Stockton Improvement Procedure Code (Stockton Code). Since then, 14 additional zones have been formed and annexed to the District. Attachment A is a map depicting the location of each of the zones within the District.

 

The Act and Stockton Code contain provisions for the City to form an Assessment District and annex zones to the District’s boundaries for the maintenance and operation of improvements that impart a special benefit to an area. The purpose of the District is to provide funding for the operations, maintenance, and replacement of stormwater quality treatment devices that comply with the City’s Stormwater Quality Control Plan and meet the City’s Stormwater National Pollutant Discharge Elimination System Permit (NPDES).

 

An Annual Engineers’ Report has been prepared for the District and submitted to the City. The Engineers’ Report has determined the actual assessments for FY 2021-22 for all the zones within the District and for each separate property within those zones. A Public Hearing is required to approve these assessments before they can be included in the San Joaquin County tax roll for collection.

 

Siegfried Engineering, Inc. of Stockton, California, was retained by Motion 2019-11-19-1108 to prepare the FY 2021-22 Annual Engineers’ Report. The Annual Engineers’ Report determines the annual assessments that are to be approved following a Public Hearing. If approved, the assessments are added on the San Joaquin County tax roll and collected with the county property taxes. These annual assessments provide funding for the inspection, operation, maintenance, repair, and replacement of the improvements in each zone and other associated administrative costs, including preparing the Annual Engineers’ Report and assessment roll. The Annual Engineers’ Report contains a budget for each zone. Attachment B provides a summary of the proposed FY 2021-22 operational budget and assessments for each district.

 

The property owners are responsible to fund only those improvements within their zone. Each assessed parcel is assigned a dwelling unit equivalent factor (DUE), or a per assessable acre factor. A single-family residential lot is equivalent to one DUE factor. The DUE factor for other classifications of developed parcels is determined by a formula detailed in the initial Council-approved Engineers’ Report for that zone.

 

Present Situation

 

None of the proposed FY 2021-22 assessments exceed the allowed maximum annual assessment set in the original Engineers’ Reports, which were approved by landowner ballots following the requirements of California Constitution article XIII D, section 6, commonly referred to as “Proposition 218,” was enacted in 1996, and accepted by Council as part of the formation and annexation proceedings. The law provides that property owners subject to the assessment have an opportunity to weigh in on the adoption of each proposed annual assessment via a public hearing held by the City Council.

 

The Engineers’ Report forming each zone included the provision for an annual escalator on the assessments in an amount equal to the greater of either 3.0 percent or the annual increase as shown in the Local Consumer Price Index for the San Francisco-Oakland-San Jose All Items, All Urban Users, as published by the Bureau of Labor Statistics for a similar period. For calendar year 2020, the annual increase was 1.1 percent. For FY 2021-22, a 3.0 percent increase has been applied to the FY 2021-22 maximum allowable assessments.

 

Proposition 218 provides the latitude to approve the maximum allowable assessment but to collect a lesser amount based on projected expenditures. Approving the maximum allowable assessment - but only assessing the amount needed for the projected expenses- allows the latitude to collect the maximum assessment in the event of unanticipated expenses and/or emergencies and complies with the requirements of Proposition 218.

 

The proposed budget for each zone within the District includes engineering fees for the preparation of the annual Engineers’ Report and tax rolls, attorneys’ fees, estimated cost of maintenance work, City of Stockton administrative costs, County costs to collect the assessments on the tax roll, replacement reserve costs, and a contingency amount. The maintenance scope of work includes vector control, weed abatement, rodent control, slope dressing, mowing, ripping, grading of the basin bottom (as needed), trash and debris pick-up and removal, cleaning of the structures, and sediment removal.

 

The operational budget amounts for the Riverbend Estates-Zone 1, Cannery Park-Zone 2A, and Prologis-Zone 13 will require an additional one-time transfer from fund balance in the amounts of $3,665.00, $266.92, and $1,263.02, respectively, to cover the deficit between the current year assessment and the operational budget. Sufficient fund balance exists to cover the deficiency; therefore, staff recommends approving the full operational budget and the transfer of funds needed from the respective fund balances for Zone 1, Zone 2A, and Zone 13.

 

The table below is a summary of the budget and per DUE factor to be assessed for each zone of the District for both FY 2020-21 and FY 2021-22, as well as the Proposed Operational Budgets and the Maximum Allowable Assessment amounts for FY 2021-22.

 

Zone No.

Zone Name

FY 2020-21 Rate Per DUE Factor

FY 2021-22 Rate Per DUE Factor

FY 2020-21 Assessment

FY 2021-22 Assessment

FY 2021-22 Proposed Operational Budget

FY 2021-22 Maximum Allowable Assessment

1

Riverbend Estates

  $37.64

  $37.64

$24,529.06

$24,529.00

$28,194.00

$44,896.41

2A

Cannery Park

    $6.76

    $6.76

  $6,660.14

  $6,660.08

 $6,927.00

$18,376.25

2B

Cannery Park

  $18.74

  $18.74

$14,078.84

$14,072.10

 $7,645.00

$19,276.13

3

Simbad Estates

$400.76

$400.76

$11,221.28

$11,221.28

$10,958.00

$25,267.25

4

Dama Estates

$678.94

$678.94

$11,541.98

$11,541.98

$11,216.00

$32,978.99

5A

Silver Springs & Gold Springs

$113.30

$113.30

$30,538.88

$30,538.88

$19,596.00

$70,664.52

5B

Silver Springs & Gold Springs

$109.24

$109.24

$3,823.40

$3,823.40

  $3,140.00

$5,622.44

6

Old Oak Estates

$198.40

$198.40

$12,300.80

$12,300.80

$11,885.00

$21,811.44

7

Oakmore Meadows, Unit 3

$380.80

$380.80

$19,895.66

$19,895.64

$16,110.00

$23,539.15

8

Little John Creek North & Little John Creek South

$358.38

$358.38

$22,577.94

$22,577.94

$18,941.00

$26,711.33

9

Malisa Manor

$761.82

$761.82

$12,189.12

$12,189.12

$11,797.00

$27,638.37

10

Meadow-lands Unit 2

$309.08

$309.08

$11,126.88

$11,126.88

$11,049.00

$34,823.75

11

Westlake Villages

    $3.66

    $3.64

$11,056.70

$10,999.94

  $9,277.00

$780,748.20

12

Moss Gardens

  $27.50

  $27.48

$11,063.00

$11,054.90

  $9,314.00

$74,584.67

13

ProLogis Park at Duck Creek

$250.85*

$250.83*

$24,536.00

$24,535.98

$25,799.00

$74,936.01

14

Calaveras IV

$390.82

$390.82

$15,632.80

$15,632.80

$15,482.00

$17,456.24

15

BD Homes

$0

$19.18

$0

$10,512.84

$10,512.84

$15,512.84

*ProLogis Park at Duck Creek (Zone 13) is the only zone within the District with assessments calculated on an assessable acre basis. The assessments for ProLogis Park are spread in proportion to the adjusted area for each parcel in Zone 13. The current assessable acreage is 97.82. The maximum assessment is $74,936.01, resulting in a per acre maximum assessment of $766.06. The actual assessment is $24,535.98 resulting in a per acre actual assessment of $250.83.

 

 

 

 

 

 

 

The anticipated FY 2021-22 ending fund balances for the zones are:

 

Zone No.

Zone Name

FY 2021-22 Anticipated Fund Balance

1

Riverbend Estates

$194,906.77

2A

Cannery Park

$  46,555.78

2B

Cannery Park

$198,850.93

3

Simbad Estates

$  88,384.94

4

Dama Estates

$103,731.30

5A

Silver Springs & Gold Springs

$471,333.18

5B

Silver Springs & Gold Springs

$  16,631.48

6

Old Oak Estates

$  81,191.37

7

Oakmore Meadows

$152,283.60

8

Little John Creek North & South

$177,693.01

9

Malisa Manor

$107,371.21

10

Meadowlands

$  89,519.00

11

Westlake Villages

$  39,671.23

12

Moss Gardens

$126,490.13

13

ProLogis Park at Duck Creek

$184,163.12

14

Calaveras IV

$    7,124.55

15

BD Homes

$           1.00

 

The FY 2021-22 Annual Engineers’ Report for the District is on file with the City Clerk and available for viewing by the public. The report contains detailed information on the budget for each zone, assessment amounts, and a complete description of improvements required to be maintained. A link to this report has been provided on the City website for access by the Mayor and each City Councilmember.

 

The required notice of public hearing will be published in The Record once, at least ten days before the public hearing.

 

FINANCIAL SUMMARY

 

The proposed Consolidated Storm Drainage Maintenance Assessment District budget for FY 2021-22 is detailed in Attachment B. The accompanying resolution recommends preliminary approval of this budget with final approval with the City’s FY 2021-22 Annual Budget to be presented to Council on June 8, 2021.

 

The City makes no financial contributions to the District. All fees, costs, and expenses incurred are paid from the proceeds of the annual assessments to be levied and collected on the San Joaquin County tax roll. Proposition 218 limits the use of the funds collected within the various zones of this District to be used to pay only the expenses related to the maintenance and operation of the specific stormwater quality treatment device(s) detailed in the Engineers’ Report for each zone. The funds collected from the property owners of a zone can only be used for work on the device(s) in that zone as it imparts a special benefit restricted to the properties of that zone. District funds are segregated and cannot be used to operate, maintain, or support the activities of the stormwater system, or any other utility at large.

 

Administration and operational costs for the maintenance of the stormwater treatment basin in Cannery Park 2B will be proportionately split with the City’s Stormwater Utility in FY 2021-22 as the basin is also used for flood control purposes.

 

There is no impact to the City’s General Fund or any other unrestricted fund because of the recommended actions.

 

Attachment A - District Zones Location Map

Attachment B - Summary of Zone Budgets