Legislation Details

File #: 22-0411    Version: 1
Type: Consent
In control: City Council and Concurrent Authorities
Final action:
Title: RESOLUTION AUTHORIZING THE PURCHASE OF A PUMP AND MOTOR FROM PUMP REPAIR SERVICE CO. FOR THE REGIONAL WASTEWATER CONTROL FACILITY BIOTOWER PUMP #2
Attachments: 1. Attachment A - Pump Repair Services, 2. Proposed Resolution

title

RESOLUTION AUTHORIZING THE PURCHASE OF A PUMP AND MOTOR FROM PUMP REPAIR SERVICE CO. FOR THE REGIONAL WASTEWATER CONTROL FACILITY BIOTOWER PUMP #2

 

recommended action

RECOMMENDATION

 

It is recommended that the City Council adopt a resolution authorizing the purchase of a replacement pump and motor from Pump Repair Service Co. for the Regional Wastewater Control Facility Biotower #2.

 

It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.

 

body

Summary

 

The Municipal Utilities Department (MUD) operates and maintains the Regional Wastewater Control Facility (RWCF), responsible for the collection, treatment and disposal of wastewater. The RWCF secondary treatment process includes the use of biotower filtration systems to improve wastewater quality.

 

Under normal operations, sewer pump and motor replacements are part of the regular maintenance program required to keep the treatment plant in operation. Staff solicited three bids for a replacement pump and motor for the Biotower #2 wastewater pump. Bids were received from Delta Pump Co. of Stockton, CA; Pump Repair Service Co. of San Francisco, CA; and Universal Pump and Supply Inc. of Stockton, CA. The bid received from Pump Repair Service Co. is the lowest responsive bid and regular in all aspects.

 

It is recommended that Council authorize the purchase of a replacement pump and motor for the Biotower #2 wastewater pump at the RWCF from Pump Repair Service Co. in the amount of $191,575.70. The installation of the pump will be performed by the MUD maintenance staff.

 

DISCUSSION

 

Background

 

The City owns and operates the RWCF to receive, treat, and discharge wastewater from the greater Stockton area to the San Joaquin River. Biotower filtration systems provide biological treatment of the wastewater as part of the treatment process.

 

The biotowers use wastewater pumps to move treated wastewater to tertiary treatment at the RWCF. The pumps at the RWCF are replaced at the end of their useful life in accordance with a pump maintenance program.

 

Present Situation

 

Staff solicited three bids for the required materials to replace the 350-horsepower pump and motor assembly for Biotower #2. The following bids were received:

 

Proponent

Bid

Freight

Bid, Freight, & 9% Tax

Delta Pump Co.

$200,760

$3,883

$222,711.40

Universal Pump and Supply Inc.

$184,400

$3,500

$204,496.00

Pump Repair Service Co.

$172,730

$3,300

$191,575.70

 

The bid submitted by Pump Repair Service Co. is the lowest responsive bid, regular in all aspects and meets the City’s specifications (Attachment A). Upon purchase and delivery, the MUD maintenance staff will replace the Biotower #2 wastewater pump.

 

FINANCIAL SUMMARY

 

There are sufficient funds available in the Wastewater Plant - Maintenance account to award the bid in the amount of $191,575.70 to Pump Repair Service Co. of San Francisco, CA.

 

There is no impact to the General Fund, or any other unrestricted fund, from this action.

 

Attachment A - Quote #120721 from Pump and Motor Repair Service Inc.