Title: ADOPT RESOLUTION TO AUTHORIZE THE MIRACLE MILE PARKING LOTS RESURFACING PROJECT
Attachments: 1. Attachment A - Vicinity Map, 2. Proposed Resolution, 3. Exhibit 1 - Notice of Exemption, 4. Exhibit 2 - Construction Contract

title

ADOPT RESOLUTION TO AUTHORIZE THE MIRACLE MILE PARKING LOTS RESURFACING PROJECT

 

recommended action

RECOMMENDATION

 

It is recommended that the City Council adopt a resolution to:

 

1.                     Approve Notice of Exemption No. NOE16-24 under the California Environmental Quality Act for the Miracle Mile Parking Lots Resurfacing, Project No. WC21021.

 

2.                     Approve the plans and specifications for the Miracle Mile Parking Lots Resurfacing, Project No. WC21021.

 

3.                     Award a Construction Contract in the amount of $168,090 to Consolidated Engineering, Inc. of Valley Springs, CA, for the Miracle Mile Parking Lots Resurfacing, Project No. WC21021.

 

It is also recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.

 

body

Summary

 

The project will resurface parking lots A and C within the Miracle Mile area, remove and replace curbs, gutters, sidewalks, driveways, and parking signage, and install striping (Attachment A).  The project was included in the 2021-26 Five-Year Capital Improvement Plan (CIP).

 

On March 28, 2024, the City received 10 bids for this project.  Staff recommends Council award a Construction Contract to the lowest responsive bidder, Consolidated Engineering, Inc., in the amount of $168,090.  Staff also recommends that Council adopt a resolution approving Notice of Exemption No. NOE16-24 under the California Environmental Quality Act (CEQA) and approving the plans and specifications for the project.  Construction is anticipated to begin in Summer 2024 and be completed by Fall 2024, weather permitting.

 

DISCUSSION

 

Background

 

The Miracle Mile is predominantly a shopping and dining district within the City of Stockton. The Miracle Mile includes businesses fronting along Pacific Avenue from Alpine Avenue to Harding Way and along Harding Way between El Dorado Street and Lincoln Street. The Miracle Mile Parking Lots Resurfacing project was included in the 2021-26 Five-Year CIP.

 

The two parking lots, A and C, within the Miracle Mile, have deteriorated and are in need of pavement improvements.  These lots are provided to support commercial businesses along the Miracle Mile. The Miracle Mile Parking Lots Resurfacing project will resurface parking lots A and C located along the Miracle Mile.  The project scope also includes removal and reconstruction of failed curbs, gutters, sidewalk segments, and driveways, preservation of all existing survey monuments, installation of new pavement markers and striping, adjustment of existing utilities to pavement finished grade, and installation of parking signage (Attachment A). 

 

On July 26, 2016, Council adopted a Community Workforce and Training Agreement (CWTA).  The CWTA became effective August 25, 2016, and applies to all Public Works projects over $1 million that are bid after that date.  On July 16, 2019, by Motion No. 2019-07-16-1403, Council extended the CWTA term to August 25, 2024.  The CWTA was not applied to this project because the estimated construction is less than $1 million.

 

Present Situation

 

On March 7, 2024, the Miracle Mile Parking Lots Resurfacing, Project No. WC21021, was advertised for bids.  On March 28, 2024, 10 bids were received with the following results:

 

COMPANY NAME                                                                                    BID AMOUNT                     ADJUSTED BID AMOUNT

(local preference applied)

 

Consolidated Engineering, Inc.                                           $168,090.00                                          $168,090.00

(Valley Springs, CA)                                                               

 

RNR Paving, Inc.                                                                                    $172,403.55                                          $172,403.55

(San Ramon, CA)

                                          

Robert Burns Construction, Inc.                                           $191,576.75                                          $187,745.22

(Stockton, CA)                                                                                    

                                          

United Pavement Maintenance, Inc.                      $190,068.00                                          $190,068.00

(Hughson, CA)                                                                                    

 

Martin General Engineering, Inc.                                           $197,945.00                                          $197,945.00

(Rancho Cordova, CA)                                                                                    

                                          

B&M Builders, Inc.                                                                                     $216,745.00                                          $216,745.00

(Rancho Cordova, CA)                                                                                    

                                          

Zara Construction, Inc.                                                                $220,400.00                                          $220,400.00

(Sacramento, CA)                                                                                    

                                          

Tom Mayo Construction, Inc.                                           $226,800.00                                          $222,264.00

(Stockton, CA)                                                                                                         

 

McFadden Construction, Inc.                                          $247,085.00                                          $242,143.30

(Stockton, CA)

 

Make It Happen Engineering, Inc.                                          $252,000.00                                          $252,000.00

(Concord, CA)

                                          

Engineer’s Estimate                                                                                                                                                   $242,225.00

 

The requirements of Stockton Municipal Code (SMC) section 3.68.090, Local Business Preference, apply to this project. Robert Burns Construction, Inc., Tom Mayo Construction, Inc., and McFadden Construction, Inc. are located within the San Joaquin County limits and are entitled to a two percent bid preference.  Application of the Local Business Preference has no effect on the bid order.  The Local Employment Ordinance, SMC section 3.68.095, also applies to this project.

 

The bid from Consolidated Engineering, Inc., the lowest responsive bidder, is regular in all respects and has the proper license to perform the work.  Staff recommends Council approve the plans and specifications and award a Construction Contract to Consolidated Engineering, Inc. of Valley Springs, CA, in the amount of $168,090. 

 

The project is in conformance with the City’s General Plan, pursuant to California Government Code, section 65402, and is categorically exempt from the requirements of CEQA as specified under Section 15301(c) of the CEQA Guidelines.  As a result, the project has been granted a Categorical Exemption.  The activities related to this project constitute a discretionary project under the City’s jurisdiction and qualifies as a project that does not have a significant effect on the environment.  The resolution will approve the filing of Notice of Exemption No. NOE16-24 under CEQA.  Construction is anticipated to begin in Summer 2024 and be completed by Fall 2024, weather permitting.

 

FINANCIAL SUMMARY

 

There is sufficient funding in the Miracle Mile Parking Lots Resurfacing, Project No.  WC21021, to award a Construction Contract to Consolidated Engineering, Inc. in the amount of $168,090.

 

There is no impact to the City’s General Fund or any other unrestricted fund as a result of taking the recommended actions.

 

Attachment A - Vicinity Map