Title: ADOPT A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO ROBERT BURNS CONSTRUCTION, INC. FOR THE RWCF OXIDATION PONDS NO. 2 AND NO. 3 INTERIOR LEVEE ROADS REPAIR PROJECT
Attachments: 1. Proposed Resolution, 2. Exhibit 1 - NOE, 3. Exhibit 2 - Construction Contract

title

ADOPT A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO ROBERT BURNS CONSTRUCTION, INC. FOR THE RWCF OXIDATION PONDS NO. 2 AND NO. 3 INTERIOR LEVEE ROADS REPAIR PROJECT

 

recommended action

RECOMMENDATION

 

It is recommended that the City Council adopt a resolution to:

 

1.                     Approve the filing of Notice of Exemption No. NOE14-24 under the California Environmental Quality Act (CEQA) for the RWCF Oxidation Ponds No. 2 and No. 3 Interior Levee Roads Repair Project, Project No. UW23016 (Exhibit 1 to the Resolution).

 

2.                     Approve the project Plans and Specifications for the RWCF Oxidation Ponds No. 2 and No. 3 Interior Levee Roads Repair Project, Project No. UW23016.

 

3.                     Award a $593,032.26 construction contract to Robert Burns Construction, Inc. of Stockton, CA, for the RWCF Oxidation Ponds No. 2 and No. 3 Interior Levee Roads Repair Project, Project No. UW23016 (Exhibit 2 to the Resolution).

 

It is further recommended that the City Manager be authorized to take appropriate and necessary actions to carry out the purpose and intent of this resolution.

 

body

Summary

 

The Municipal Utilities Department (MUD) operates and maintains a wastewater system that collects and treats an average of 30 million gallons a day of sewage from the City of Stockton under the National Pollution Discharge Elimination System (NPDES) permit criteria before discharging into the San Joaquin River. The wastewater is collected and routed to the Regional Wastewater Control Facility (RWCF) through an extensive network of over 1,500 miles of pipe and 35 pump stations. Currently, the RWCF oxidation ponds provide further biological treatment of the secondary sewer treatment process. The interior service roads for ponds No. 2 and No. 3 are currently in poor condition and need resurfacing.

 

If approved by the City Council, this action will award a construction contract in the amount of $593,032.26 to Robert Burns Construction, Inc. of Stockton, CA, to perform the necessary work at the oxidation ponds.

 

 

 

 

 

DISCUSSION

 

Background

 

The Municipal Utilities Department (MUD) operates and maintains its wastewater treatment and disposal system at the Regional Wastewater Control Facility (RWCF) located at 2500 Navy Drive in Stockton. The oxidation ponds at the RWCF are a suspended-growth treatment process that consists of three (3) ponds located across the San Joaquin River from the Stockton RWCF Main plant at 2500 Navy Drive. These ponds include various exterior and interior service roads around their respective perimeters. The interior service roads for ponds No. 2 and No. 3 are in poor condition, and it was determined that the roads need to be resurfaced to provide safe access for staff.

 

As part of the 2023-28 Capital Improvement Program, a project was created to perform repairs on the levee roads. Seigfried Engineering prepared the plans and specifications for the project. The project design was completed and placed out to bid for the interior levee roads construction work.

 

Present Situation

 

On January 25, 2024, the MUD advertised the project in the Stockton Record and posted it to the City’s Bid Flash webpage. Additionally, a brief project description notice was mailed to 99 contractors holding a Class “A” license and notifications were sent through Ask Stockton. A non-mandatory pre-bid conference meeting was held on February 15, 2024, with six (6) prospective bidders in attendance. 

 

On Thursday, February 29, 2024, ten (10) sealed bids were received and publicly opened by the City Clerk with the following results:

 

COMPANY NAME

LOCATION

BID PRICE

B&M Builders, Inc.

Rancho Cordova, California

$885,396.30

The Design Build, Inc.

Sacramento, California

$1,259,510.00

Dirt Dynasty, Inc.

Farmington, California

$598,030.60

George Reed, Inc.

Modesto, California

$628,227.00

Granite Rock Co.

San Jose, California

$719,579.00

OC Jones & Sons, Inc.

Berkeley, California

$675,551.60

Robert Burns Construction, Inc.

Stockton, California

$593,032.26

Soracco, Inc.

Lodi, California

$628,870.00

Tom Mayo Construction

Stockton, California

$663,271.00

United Pavement Maintenance, Inc.

Hughson, California

$722,595.72

Engineer’s Estimate

 

$1,050,000.00

 

The bid received from Robert Burns Construction Inc., is regular in all aspects and compliant with the project specifications.

 

Staff recommends that the City Council award a construction contract in the amount of $593,032.26 to Robert Burns Construction, Inc. of Stockton, CA, for the RWCF Oxidation Ponds No. 2 and No. 3 Interior Levee Roads Repair, Project No. UW23016.

 

Local Employment Ordinance

 

The contract amount is over $100,000 and subject to the Local Employment Ordinance, which requires that “all City contracts for public works or improvements of estimated value or City subsidy of $100,000 or more shall contain provisions pursuant to which the contractor promises to make a good faith effort, with the assistance of local labor union hiring halls or community organizations designated by the City to employ qualified individuals who are, and have been for one year prior to the effective date of the contract, residents of Stockton in sufficient numbers so that no less than 50 percent of the contractor’s total construction workforce, including any subcontractor workforce, measured in labor work hours, is comprised of Stockton residents.” 

 

The Local Preference Ordinance, which states that “preference shall be given to the purchase of supplies, materials, equipment, and contractual services from local merchants, quality and price being equal,” applies to the project because four (4) bidders are located within the limits of the City of Stockton or San Joaquin County. 

 

The project is under $1,000,000 and is not subject to the Community Workforce and Training Agreement.

 

Environmental Clearance

 

It has been determined that this project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA) as specified under Article 19, Section 15302, Class 2 (c) of the CEQA guidelines, as it involves the replacement or reconstruction of an existing public facility where the new structure will be located on the same site and will have substantially the same purpose and capacity as the structure replaced.

 

In addition, the proposed project is consistent with the Government Code Section 65402 and the 2040 Stockton General Plan (Land Use Policy 6.3) because it improves existing utility services to ensure that all neighborhoods have access to well-maintained public facilities and utilities that meet community service needs.

 

FINANCIAL SUMMARY

 

There are sufficient funds in the Wastewater Capital Improvements account to award the construction contract in the amount of $593,032.26 to Robert Burns Construction, Inc. of Stockton, California, for the RWCF Oxidation Ponds No. 2 and No. 3 Interior Levee Roads Repair, Project No. UW23016.

 

There is no impact to the City’s General Fund or any other unrestricted fund from this action.